Резюме epc project coordinator Мужчина Ташкент управление недвижимостью


ID 11494
Пол: Мужчина
Дата рождения: 29 September 1986
Город: Ташкент
Раздел: Строительство, проектирование, недвижимость
Специализация: Управление недвижимостью
Должность: EPC Project Coordinator
Занятость: Полная занятость
Образование: Высшее бакалавр
Учебные заведения (перечислите в обратной последовательности год поступления и окончания, название ВУЗа, факультет и специальность): 2017 Robert Gordon University MBA in Oil and Gas Management, BA in Oil & Gas Management 2009 Tashkent Institute of Rail Transport Engineers Faculty of Civil Engineering, Civil Engineer
Дополнительное образование (перечислите все курсы и тренинги в обратной последовательности): 2014 LPMP IN CAPITAL PROJECTS FOR LUKOIL OVERSEAS PM TEAMS «SKOLKOVO» Moscow School of Management & Management Training & Development Center, Project Management 2014 Methodology of Integrated Project Management System LUKOIL Overseas, Project Management 2014 LUKOIL OVERSEAS PROJECT MANAGENT FORUM 2014 LUKOIL OVERSEAS, Project Management 2013 Upper Intermediate - CEFR Level B2, Leadership and Management EF Education First, HULT International, Extension courses - English 2011 Internal Auditors of Quality Management Systems - ISO 9001:2008, Implementation of international standards of series ISO 9001 DQS Quality System LLC, SO 9001:2008
Знание ПК (указать программы и степень владения): эксперт
Знание языков: Узбекский - Начальный
Другой язык: Russian — native English — I am a fluent speaker Uzbek — I am a fluent speaker
Водительские права:   B
Опыт работы (перечислите все места работы, какую должность занимали, причины увольнения): , January 2013 — till now 5 years Kandym Development Project, Engineering Division, Infrastructure and Early Facilities Design Department, Lukoil Uzbekistan Operating Company LLC Uzbekistan, lukoil-overseas.uz/en Chief Expert  PROJECT: "Construction of CPF Complex and Development of Kandym Group of Fields" (>$3bln.).  Coordination of the Project on transport infrastructure facilities (~ 423km of roads, 52km of railways, including 2 railway stations, 10 bridges) and accompanying objects (buildings, fencing, truck loading terminals, etc. inside CPF area);  Control over engineering survey implementation and results (~4900ha);  Control over development of plot plans, soil mass plans, site development plans and vertical leveling plans;  Expert review and technical control over design documentation developed during Basic Design/FEED/DD stages;  Interface Management between subcontractors, Contractor and Client on a technical issues;  Technical support to Construction team during construction and design supervision;  Timely decision making for issues related to the DD Documents arising during the construction process;  Formalizing of changes and additions to the Detailed Design documentation in accordance with Section 7 of GOST 21.101 for all the Facilities of the Project;  Inspection of construction works with respect to their conformance with the design decisions, described in the DD Documents as well as compliance with process technology (including the design of construction arrangement works), quality of operational, construction and installation works and process installation works and other types of equipment;  Business correspondence development;  Control of obtaining technical specifications from crossings owners for whole Project;  Approval of project documentation in government expertize;  Co-authorship of PHASE 3 DECISION SUPPORT PACKAGE FOR KANDYM PROJECT (FID).May 2012 — October 2012 6 months Planning Department, Kukdong Engineering & Construction Co., LTD. Uzbekistan, www.kukdong.co.kr Engineer/designer  PROJECT: “Reconstruction of 85-km section of motor road A-380 “Guzar - Bukhara - Nukus - Beineu” (355 km - 440 km)”  Detailed analysis of estimate documentation;  Proposals development on the effective use of funds allocated for the Project execution;  Preparation of cash-flow statements;  Control and planning of subcontractors on-site activities (weekly & monthly basis);  Preparation of daily reports;  Interfaces with local design institutes;  Obtaining of approvals from Government for construction documentation;  Receiving licenses from owners and Government for temporary use of construction borrow pits;  Engineering support of the Project on PC stage.July 2009 — May 2012 2 years 11 months Roads and Surveys Department, "Uzbekistan Railways" State Joint-Stock Railway Company, OOO "ToshTemirYulLoyiha" Design Institute Other countries, uzrailway.uz 1st Class Engineer   Engineering survey for new construction and reconstruction of existing facilities;  Design of motor roads and railway transport facilities in accordance with the regulations of the Republic of Uzbekistan, the Russian Federation and international standards;  Endorsement and approval of the design solutions with stakeholders;  Geodetic support of construction from greenfield to hand-over to the Client (survey base, detailed surveying, performing of as-built surveys, vertical planning works, design supervision);  Preparation of Technical Certificates, and Instructions on Maintenance of railway tracks and stations;  Engineering management of the Projects (<$100k); Over 3 years I have been directly involved in the construction of the new high-speed railway line "Yangiyer-Dashtabad", in reconstruction of high-speed railway line "Tashkent-Samarkand", in construction of field roads and facilities throughout Uzbekistan, and in reconstruction of railway stations and oil terminals of Uzbekistan.
Личные качества: Family status – Married, one infant
Более подробную информацию о специалисте Вы можете
получить позвонив по тел./факс: +(99871) 276-35-79; 276-29-09
или написав на e.mail: professionals.uz@mail.ru

Обновить

Авторизация

Топ 4 статей

Основные вопросы перед увольнением работника.
Эффективное построение карьеры
Как переманить профессионала?
Особенности поиска работы в Ташкенте.
Яндекс.Метрика